Put in the Coir Matting in the trench. Put not less than 12 inches with the roll above the trench (even further up the slope). Area Every single staple a few foot apart Within the trench Slice and Match: Trim the mat to fit irregular parts or road blocks employing https://coirmat31504.ttblogs.com/18614141/5-tips-about-coir-matting-you-can-use-today